If you are planning to build a post-frame building in Calcasieu Parish, Louisiana, specifically in the 70633 ZIP code (DeQuincy area), understanding the parish permitting process is an important first step. Permits ensure your building complies with zoning rules, floodplain regulations, and the Louisiana State Uniform Construction Code before construction begins.

Permitting Authority

For properties located outside of city limits, building permits are issued and administered by the Calcasieu Parish Division of Planning and Development. This office oversees permit applications, plan reviews, zoning verification, floodplain compliance, and required inspections for post-frame construction.

Calcasieu Parish Planning & Development
901 Lakeshore Drive, 5th Floor
Lake Charles, LA 70602
Main Phone: 337-721-3600
Building Permits: 337-721-3610

Is a Permit Required?

Yes. A building permit is required before construction begins on post-frame buildings in Calcasieu Parish. This includes agricultural buildings, accessory structures, storage buildings, workshops, and fully enclosed post-frame buildings. Permit review ensures compliance with parish ordinances and the Louisiana State Uniform Construction Code, protecting both the property owner and the contractor.

How to Apply for a Building Permit (Online)

Calcasieu Parish allows applicants to submit permit applications through its online permitting system, which helps streamline the review process.

Step 1: Create an Online Account

Applicants must register through the parish’s online permitting portal to submit applications, upload plans, pay fees, and schedule inspections.

Step 2: Prepare Required Documents

Most post-frame permit applications require:

  • A site plan showing building location and setbacks
  • Structural drawings and specifications
  • Engineered plans
  • Foundation or post embedment details

     

Step 3: Submit Application and Upload Plans

All documentation is uploaded electronically and reviewed by parish staff for zoning, floodplain, and code compliance.

Step 4: Pay Fees and Track Review

Permit and plan review fees are paid online. Applicants can monitor review comments and respond if revisions are requested.

Step 5: Schedule Inspections

Once the permit is issued, required inspections must be scheduled and approved before advancing to the next phase of construction.

Permit Checklists and Fee Schedules

Calcasieu Parish provides official permit checklists and fee schedules to help ensure applications are complete and accurate.

Following the checklist closely helps prevent delays caused by missing documents or incomplete plans.

Additional Permitting Considerations for ZIP 70633 (DeQuincy Area)

Floodplain Requirements

Portions of the DeQuincy area are located within FEMA-designated flood zones. If a property is in a floodplain:

  • A Floodplain Development Permit may be required
  • Elevation certificates or engineered foundation designs may be requested
  • Finished floor elevations must meet parish and FEMA requirements

Floodplain review is a common cause of permitting delays if not addressed early.

Engineered Plans

Engineered drawings are commonly required for post-frame buildings in Calcasieu Parish, particularly for:

  • Larger buildings
  • Fully enclosed structures
  • Buildings with roll-up or overhead doors
  • Commercial or storage use

Plans must address wind loads, uplift resistance, and foundation requirements under the Louisiana State Uniform Construction Code.

Wind Load Design

Southwest Louisiana is subject to higher wind exposure requirements. Permit reviewers often verify:

  • Wind exposure category
  • Post embedment depth and anchoring
  • Reinforcement around large doors and openings

These items are especially important for post-frame construction.

Zoning and Setbacks

Before approval, the parish confirms:

  • Zoning classification
  • Building use (agricultural, accessory, or commercial)
  • Required setbacks from property lines

Zoning or setback issues can delay permit approval if not clarified early.

Separate Trade Permits

Electrical, plumbing, and mechanical work typically require separate permits, even after the main building permit is issued. Licensed contractors may be required depending on scope of work.

Inspections

Post-frame buildings commonly require inspections at:

  • Post hole or foundation stage
  • Framing
  • Final inspection

Each phase must be approved before moving forward.

How Mallett Buildings Helps With Permitting

While permits are ultimately the property owner’s responsibility, Mallett Buildings helps simplify the process by:

  • Providing engineered building plans required for permit submittal
  • Supplying building specifications and construction details requested by the parish
  • Helping customers understand what documents are needed and when
  • Coordinating timelines so materials are not delivered before permits are approved

Our goal is to help customers avoid delays, unexpected costs, and last-minute issues that can slow down construction.

For ZIP 70633, most post-frame permitting delays stem from floodplain documentation, missing engineered plans, zoning questions, or incomplete site plans. Addressing these items early helps keep your project on schedule and avoids costly interruptions.

Understanding the Calcasieu Parish permitting process before materials are delivered helps protect your investment and ensures a smoother build from start to finish.