If you’re planning an accessory building in Prairieville, LA (70769), your project will be permitted through Ascension Parish, one of the fastest-growing areas in Louisiana. Whether you’re building a post-frame shop, storage building, garage, metal building, or barn, Prairieville homeowners must secure the correct Ascension Parish permits before construction begins.
Here is a Prairieville-specific overview of what to expect when permitting an accessory structure in Ascension Parish.
1. The Parish Responsible for Permits
ZIP code 70769 falls under Ascension Parish.
All permitting — including accessory buildings — is handled through the parish’s Building Department and Planning & Development Department.
These offices oversee zoning, building code compliance, floodplain regulations, and inspections.
2. A Permit Is Required for Accessory Structures
Ascension Parish requires a permit for any accessory structure, including:
- Post-frame buildings
- Metal shops
- Barns
- Storage sheds
- Detached garages
- RV covers
Even if the structure does not include utilities, a permit is still required.
Accessory buildings must comply with the Ascension Parish Development Code and Louisiana State Uniform Construction Code.
3. Accessory Structure Permit Application
Ascension Parish provides a dedicated online form for these projects:
- Residential Accessory Structure Permit Application
This form is required for all detached accessory buildings and must be completed before construction begins.
You will need to provide:
- Structure dimensions
- Location on the property
- Intended use
- Whether plumbing or electrical is included
- Construction drawings (Mallett Buildings supplies engineered plans)
- Site plan with setbacks
4. Required Site Plan
Your site plan must show:
- Property lines
- Driveway and access points
- Placement of the accessory building
- Setback distances
- Any servitudes/easements
- Existing structures
- Utility locations
This is used by the parish to confirm zoning compliance and placement accuracy.
5. Setbacks & Zoning
Setbacks vary by zoning district, which is managed by the Ascension Parish Planning Department. While specific setbacks depend on your zoning classification (A-1, RM, MU, etc.), common requirements include:
- Distance from the front property line
- Distance from side property lines
- Distance from the rear property line
Customers should verify zoning for their parcel before submitting the application.
Because the specific numeric setbacks for accessory buildings in each zoning district aren’t clearly listed online in an easily accessible table, customers should:
- Request the “Structure and Lot Regulations” section (17-2072) from the Ascension Parish Code for their zoning district.
- Contact the Planning & Development Department (225-450-1002) and ask for confirmed setback distances for accessory structures in their parcel’s zoning classification.
- Include in their site plan accurate setback measurements based on confirmed data before submittal.
- Confirm that the accessory building complies with setbacks for their specific zone (RM, A-1, R, MU, etc.) to avoid plan rejection.
6. Flood Zone Requirements
Ascension Parish is known for varying floodplain conditions. Your lot may require:
- A Flood Elevation Certificate
- Engineered foundation plans
- Additional documentation for structures in AE, A, or X zones
Flood zone requirements must be confirmed before the permit is issued.
Note: If your Base Flood Elevation (BFE) requires your building site to be raised by 3 feet or more, the fill dirt used to build up the pad must come from your own property. Imported dirt cannot be hauled in to achieve the required elevation.
7. Engineering Requirements for Post-Frame & Metal Buildings
Because Mallett Buildings specializes in engineered post-frame construction, Ascension Parish may require:
- Stamped engineered drawings
- Wind load calculations
- Foundation/slab details
- Anchoring requirements
- Truss engineering
Mallett Buildings provides all required engineered documents for submittal.
8. Inspections
After your permit is approved, Ascension Parish requires scheduled inspections. Depending on your build, these may include:
- Footing or foundation inspection
- Framing/structural inspection
- Electrical or plumbing (if applicable)
- Final inspection
It’s important to keep your permit posted visibly on-site until final approval.
Final Thoughts
Planning ahead is the key to keeping your build on schedule. By securing your permit early, preparing a complete site plan, confirming zoning, and understanding flood zone requirements, you’ll avoid delays and ensure your Mallett building can be constructed without interruption.
If you need help locating your zoning district or determining which requirements apply to your specific property in 70769, our team can point you in the right direction.