Before your crew arrives, a thoroughly prepared site sets the stage for a smooth build. For a post-frame building, it’s not just about picking a flat spot—it’s about handling clearance, grading, drainage and access. For example, even a few inches of slope from one side to the other can lead to pooling water, shifting doors or uneven settling over time.
Here are the essentials:
1.) Clear the footprint of trees, roots, organic material, debris or stumps. Anything left in place can decompose or shift and undermine the base. It is also important to clear the perimeter around the building pad and provide a proper drive to the site for heavy equipment during construction —delivery trucks, concrete trucks, boom lifts or forklifts need to reach the site without obstruction. Also plan for staging areas for materials.
2.) Make sure the soil type and compaction meet requirements. Mallett Buildings does not specify a required soil type in our contract documents, as our serviceable areas have a wide variety of soil conditions (from sandy loam to clay). The assumption is that native soil at the site will be used unless it is unsuitable.
3.) Ensure adequate drainage: the grading should direct water away from the building, not allow it to pool around posts or the slab edge.
4.) Grade the pad so that it’s level. For a Mallett Buildings post-frame structure, the maximum allowable deviation for a building pad should typically be no more than 1 inch across the entire building footprint — and in many cases, 1/2 inch is the target. Once the pad is level, mark the building corners. Mallett Buildings can assist you with marking the corners, but ultimately, it is up to you to know where the building is to be located on your property.
Mallett Buildings does not provide grading services, as part of a standard build but:
- We do inspect the grade during the form and concrete prep phase.
- It is the customer’s responsibility to provide adequate fill and ensure the site drains properly .
- Verify truck and equipment access: delivery trucks, concrete trucks, boom lifts or forklifts need to reach the site without obstruction. Also plan for staging areas for materials.
By making sure your site is ready before framing begins, you help avoid delays, added cost and long-term problems with the structure’s stability or service life.